Precision Manufacturing
Huiyang District, Huizhou City, Guangdong Province
Project Installed Capacity: 1.8 MWp
Average Annual Power Generation: 1,705 MWh
Average Annual Carbon Emissions: 1,637 tons
Grid-Connection Completion Date: December 2024
Precision Manufacturing
Huiyang District, Huizhou City, Guangdong Province
Project Installed Capacity: 1.8 MWp
Average Annual Power Generation: 1,705 MWh
Average Annual Carbon Emissions: 1,637 tons
Grid-Connection Completion Date: December 2024
PV Power Generation
Contact Us
7th Floor, Building E, Longjing Science and Technology Park, No. 335 Bulong Road, Bantian Subdistrict, Longgang District, Shenzhen, Guangdong Province Request a Quote
Product Overview
Product Introduction
Precision Manufacturing
Huiyang District, Huizhou City, Guangdong Province
Project Installed Capacity: 1.8 MWp
Average Annual Power Generation: 1,705 MWh
Average Annual Carbon Emissions: 1,637 tons
Grid-Connection Completion Date: December 2024