Container Manufacturing
Fenggang Town, Dongguan City, Guangdong Province
Project Installed Capacity: 8.56 MWp
Annual Power Generation: 8,305 MWh
Annual Carbon Emissions Offset: 7,901 tons
Grid-connection Completion Date: June 2024
Container Manufacturing
Fenggang Town, Dongguan City, Guangdong Province
Project Installed Capacity: 8.56 MWp
Annual Power Generation: 8,305 MWh
Annual Carbon Emissions Offset: 7,901 tons
Grid-connection Completion Date: June 2024
PV Power Generation
Contact Us
7th Floor, Building E, Longjing Science and Technology Park, No. 335 Bulong Road, Bantian Subdistrict, Longgang District, Shenzhen, Guangdong Province Request a Quote
Product Overview
Product Introduction
Container Manufacturing
Fenggang Town, Dongguan City, Guangdong Province
Project Installed Capacity: 8.56 MWp
Annual Power Generation: 8,305 MWh
Annual Carbon Emissions Offset: 7,901 tons
Grid-connection Completion Date: June 2024