Electronic Components Manufacturing
Shunde District, Foshan City, Guangdong Province
Project Installed Capacity: 0.8 MWp
Average Annual Power Generation: 790 MWh
Average Annual Carbon Emissions: 760 tons
Grid-connection Completion Date: December 2023


0755-23322806
0755-23322806
DavidWang@solarstock.com
7th Floor, Building E, Longjing Science and Technology Park, No. 335 Bulong Road, Bantian Subdistrict, Longgang District, Shenzhen, Guangdong Province
