Automobile Manufacturing
Xinjian District, Nanchang City, Jiangxi Province
Project Installed Capacity: 4.3 MWp
Annual Power Generation: 3,880 MWh
Annual Carbon Emissions: 3,728 tons
Grid Connection Completion Date: May 2016
Automobile Manufacturing
Xinjian District, Nanchang City, Jiangxi Province
Project Installed Capacity: 4.3 MWp
Annual Power Generation: 3,880 MWh
Annual Carbon Emissions: 3,728 tons
Grid Connection Completion Date: May 2016
PV Power Generation
Contact Us
7th Floor, Building E, Longjing Science and Technology Park, No. 335 Bulong Road, Bantian Subdistrict, Longgang District, Shenzhen, Guangdong Province Request a Quote
Product Overview
Product Introduction
Automobile Manufacturing
Xinjian District, Nanchang City, Jiangxi Province
Project Installed Capacity: 4.3 MWp
Annual Power Generation: 3,880 MWh
Annual Carbon Emissions: 3,728 tons
Grid Connection Completion Date: May 2016