Shenzhen Metro
Futian District, Shenzhen City, Guangdong Province
Project Installed Capacity: 20 kWp
Average Annual Power Generation: 20.5 MWh
Average Annual Carbon Emissions Offset: 19.7 tons
Grid-connection Completion Date: December 2022
Shenzhen Metro
Futian District, Shenzhen City, Guangdong Province
Project Installed Capacity: 20 kWp
Average Annual Power Generation: 20.5 MWh
Average Annual Carbon Emissions Offset: 19.7 tons
Grid-connection Completion Date: December 2022
PV Power Generation
Contact Us
7th Floor, Building E, Longjing Science and Technology Park, No. 335 Bulong Road, Bantian Subdistrict, Longgang District, Shenzhen, Guangdong Province Request a Quote
Product Overview
Product Introduction
Shenzhen Metro
Futian District, Shenzhen City, Guangdong Province
Project Installed Capacity: 20 kWp
Average Annual Power Generation: 20.5 MWh
Average Annual Carbon Emissions Offset: 19.7 tons
Grid-connection Completion Date: December 2022