Airport
Bao'an District, Shenzhen, Guangdong Province
Project Installed Capacity: 5.0 MWp
Average Annual Power Generation: 5,520 MWh
Average Annual Carbon Emissions Offset: 4,286 tons
Grid-connection Completion Date: June 2015
Upon completion, the project displaces approximately 55,000 kWh of fossil fuel-based electricity generation annually, reducing carbon dioxide emissions by about 4,200 tons per year—equivalent to planting 38,500 trees.
This project provides Shenzhen Airport with a stable supply of clean, renewable electricity, thereby alleviating pressure on energy demand. It delivers significant benefits in terms of energy conservation, emissions reduction, and environmental stewardship, standing as a benchmark demonstration project with profound significance as a model for future initiatives.


0755-23322806
0755-23322806
DavidWang@solarstock.com
7th Floor, Building E, Longjing Science and Technology Park, No. 335 Bulong Road, Bantian Subdistrict, Longgang District, Shenzhen, Guangdong Province
