Agricultural Products Logistics Park
Chaoyang District, Shantou City, Guangdong Province
Installed Capacity: 10.6 MWp
Average Annual Power Generation: 11,760 MWh
Average Annual Carbon Emissions Offset: 11,300 tons
Grid-connection Completion Date: December 2024


0755-23322806
0755-23322806
DavidWang@solarstock.com
7th Floor, Building E, Longjing Science and Technology Park, No. 335 Bulong Road, Bantian Subdistrict, Longgang District, Shenzhen, Guangdong Province
