Eastern Guangdong Coastal Agricultural Market PV Power Generation Project
Product Introduction:

Agricultural Products Logistics Park

Chaoyang District, Shantou City, Guangdong Province

Installed Capacity: 10.6 MWp

Average Annual Power Generation: 11,760 MWh

Average Annual Carbon Emissions Offset: 11,300 tons

Grid-connection Completion Date: December 2024


Contact Us

7th Floor, Building E, Longjing Science and Technology Park, No. 335 Bulong Road, Bantian Subdistrict, Longgang District, Shenzhen, Guangdong Province

Request a Quote

Product Overview

Product Introduction

Agricultural Products Logistics Park

Chaoyang District, Shantou City, Guangdong Province

Installed Capacity: 10.6 MWp

Average Annual Power Generation: 11,760 MWh

Average Annual Carbon Emissions Offset: 11,300 tons

Grid-connection Completion Date: December 2024


Get a Project Proposal Quote

© 2026 Guangdong SolarStock New Energy Technology Co., Ltd.

粤ICP备14078100号